|
|
|
|
|
Sierra Valley Ground Water Main District 3-600' Nested Wells
|
|
City Of Tracy 9-6" Monitoring Wells 400'-800'
|
|
City Of Bakersfield WWTP 8-160' Monitoring Wells
|
|
City of Porterville
WWTP 14-140' Monitoring Wells
|
|
Fresno Irrigation District Monitoring Wells Various Locations
|
|
Aero-Jet, Sacramento, CA 4 Test holes & Monitoring wells /Depths to 600 ft. Drilled 6 1/2" Test holes with E-logs, Caliper Logs and Gamma neutron logs Reamed holes to 9 7/8" and Installed 6 5/8" Casing Pumped concrete through casing to fill annular space Gun perforated casing for sampling
|
|
Woodlake Landfill-Woodlake, CA,(Closed), BSK & Associates Three 100 ft. 2" Monitoring wells One 160 ft. 8 5/8" De-Watering wells
|
|
Browing-Ferris Ind. Landfill, Fresno, CA Purcell Rhodes & Associates One 2" Observation well Six 100 ft. 6" Sch 80 Monitoring wells Six Dedicated Test Pumps
|
|
Purity Oil Sales Site, Fresno, CA, CH2M-Hill, Southeast, Inc. Fourteen 1/3HP stainless steel pumps, on 1/2" stainless steel pipe and miscellaneous stainless steel fitting installed into Monitoring wells.
|
|
Spreckles Sugar Corporation, Salinas, CA Three 70 ft 6" Sch 80 PVC Monitoring wells, plus grouting and test pumping
|
|
Highway 33 and Adams, Tranquility, CA,Westland Water District Thirty-two 20 ft.-30 ft. Piezometer wells
|
|
Department of Water Resources, Kern Water Bank Three 600 ft 6" steel monitoring wells
|
|
City of Fresno-Water Department 300 - 2" and 4" Monitoring wells, depths from 140 ft to 950 ft.
|
|
State Center Community
College, Reedley, CA
Five 80 ft. 4" Monitoring wells /One 80 ft. 6" Extraction wells
|
|
Simplot Co., Helm, CA 220 ft. 8" Extraction well
|
|
Tri-Valley Growers, Madera, CA 620 ft. 8" Drilling with 10 water samples / Three 8" Extraction wells total feet 590 ft.
|
|
San Jose Water Co. One 1,000 ft. 8 3/4" Test hole with E-log
|
|
McQuay International, Visalia, CA Three 6" Monitoring wells
|
|
State of California Department of Corrections, Chowchilla, CA Six 5" 300 ft. Monitoring wells
|
|
Dublin San Ramon Services District, Dublin, CA 600 ft. to 800 ft. Nested Completions
|
|
Great Basin Unified Air Pollution Control District, Bishope, CA Three 600 ft. Nested completion Wells / One 8" Extraction Well
|
|
Fresno Air Terminal, Fresno, CA Fifteen 100 ft. to 200 ft. 4" Monitoring Wells
|
|
|